| FEE/0835-22 |
DPS - Planting - Yorkshire Forest District |
23/02/2029 12:00 |
22/07/2021 |
23/02/2029 |
23/02/2028 |
£480,000.00 |
|
|
|
|
Planting in Yorkshire Forest District |
| FCCN004435-124 |
Vegetation Management Framework - Yorkshire |
30/03/2026 12:00 |
11/05/2026 |
10/05/2030 |
|
£400,000.00 |
|
|
|
|
The Civil Engineering, Estates, Ecology and Heritage teams require qualified Suppliers with demonstrable experience in mechanical vegetation control across forest infrastructure, particularly around bridges and reservoirs.
This framework agreement is arranged in one Lot which will have a maximum of four Suppliers. |
| FEE/1047-18 |
DPS - Forestry England Forest Fencing |
23/02/2029 12:00 |
20/10/2022 |
23/02/2029 |
23/02/2028 |
£13,000,000.00 |
|
|
|
|
Forestry England are establishing a Dynamic Purchasing System (DPS) under which to place contracts for the erection and maintenance of forest fencing on sites across the Forestry England estate. This will also include fencing for new woodland creation sites throughout England and forest fencing requirements for Forest Research.
The types of fencing required include, but are not limited to: permanent deer fencing, stock-proof fencing, rabbit-proof fencing, forest gates/barriers/water gates. |
| FEE/0816-42 |
DPS - East Forest District Planting |
23/02/2029 12:00 |
30/06/2021 |
23/02/2029 |
23/02/2028 |
£2,000,000.00 |
|
|
|
|
East Forest District Planting |
| FEE/0923-60 |
DPS - West England Forest District Planting and Maintenance |
23/02/2029 12:00 |
15/06/2022 |
23/02/2029 |
23/02/2028 |
£8,000,000.00 |
|
|
|
|
This DPS is for Planting in West England Forest District. For full details of our needs, please read the separate specification document. |
| FCCN002249-21 |
DPS - Ash and Dangerous Tree Roadside Removal - West District |
23/02/2029 12:00 |
21/05/2024 |
23/02/2029 |
23/02/2028 |
£1,000,000.00 |
|
|
|
|
The work under this DPS will comprise the felling and extraction of diseased and dangerous trees that are considered a risk to the public along highways, adjacent to infrastructure including facilities, trails and public rights of way, or on forest boundaries. The sites are a larger scale than individual trees.
The majority of work will be completed using a mechanised method such as a grapple saw or harvester and forwarder/tractor and timber trailer for extraction. On some occasions the assistance of motor manual chainsaws maybe required to process the trees. The use of a tractor and winch maybe required for operational purposes. |
| FEE/0909-23 |
DPS - Central Forest District Planting |
23/02/2029 12:00 |
12/05/2022 |
23/02/2029 |
23/02/2028 |
£2,000,000.00 |
|
|
|
|
Planting in Central Forest District |
| FCCN000267-24 |
DPS - North England Forest District Ground Preparation Operations |
23/02/2029 12:00 |
08/04/2024 |
23/02/2029 |
23/02/2028 |
£10,000,000.00 |
|
|
|
|
Provision of ground preparation services to facilitate restocking operations across the North England Forest District. |
| FEE/1024-52 |
DPS - North Forest District Planting and Forest Management |
23/02/2029 12:00 |
03/08/2022 |
23/02/2029 |
23/02/2028 |
£10,000,000.00 |
|
|
|
|
Services to facilitate the planting, establishment, and early years maintenance of coniferous and broadleaf restock and new woodland sites. |
| FCCN002028-19 |
DPS - Civil Engineering Works |
23/02/2029 12:00 |
01/12/2024 |
23/02/2029 |
23/02/2028 |
£20,000,000.00 |
|
|
|
|
The Commission requires the following construction activities to be delivered under this DPS:
- Construction of granular forest roads
- Construction of granular pedestrian and shared use trails
- Construction of forestry harvesting infrastructure such as tracks, ramps and stacking bays.
- Significant upgrades to existing granular forest roads including grading and rolling
- Construction of bound roads and trails
- Car parks and extensions to existing facilities
- Construction of forestry road bridges
- Pedestrian bridges (typically 10m length)
- Reservoir works, such as spillway upgrades, significant repairs, etc.
- Culverts
- Retaining walls (typically 2m retained height and 10m long)
- Supply and installation of new and replacement utility services such as foul drainage systems, surface water drainage and water supply pipes and equipment.
- Supply and installation of trenching to accommodate utility services such as drainage systems, water supply and electric and data communication equipment, which could be either direct lay or installed within ducting.
- Construction of Sustainable Drainage Systems (SuDS) to manage rainwater runoff.
- Other civil engineering construction projects
- Maintenance works where these form part of a larger construction project
- Supply and or haulage of aggregates where these form part of a larger construction project
- Excavation and removal/disposal of deteriorated or unsuitable materials where these form part of a larger construction project
We require suppliers to have capability in the following areas:
- Excavation and compaction of road and trail formation to appropriate line and level
- Drainage installation and maintenance
- Soft ground working
- Steep ground working
- Procuring, laying and compaction of granular materials
- Procuring, laying and compaction of bituminous materials
- Kerbing
- Retaining wall construction
- Structural steelwork associated with simple bridge construction
- Reinforced and unreinforced concrete
- General carpentry work
- Install of utility services such as drainage, pipes and cables.
- Landscaping
The list of work which is required is descriptive only and the Commission may require and instruct works which are analogous to those listed. Typical contract values are between £50,000 to £250,000, but there are no financial limits imposed. |
| FCCN1932-47 |
DPS - National Wildlife Management |
23/03/2029 12:00 |
20/11/2024 |
23/02/2029 |
23/02/2028 |
£750,000.00 |
|
|
|
|
Wildlife Management across England |
| FEE/0698-25 |
DPS - Plant Passporting Annual Inspections |
23/02/2029 12:00 |
13/08/2020 |
23/02/2029 |
23/02/2028 |
£1,030,000.00 |
|
|
|
|
Inspections of plant passports and other associated inspections and audits. |
| FEE/0815-45 |
DPS - East Forest District Ground Preparation Works |
23/02/2029 12:00 |
08/06/2021 |
23/02/2029 |
23/02/2028 |
£1,680,000.00 |
|
|
|
|
Ground Preparation Works in East England Forest District |
| FCCN1763-20 |
DPS - Vegetation Management - East England Forest District |
23/02/2029 12:00 |
18/10/2024 |
23/02/2029 |
23/02/2028 |
£400,000.00 |
|
|
|
|
Vegetation management in East England Forest District, types of work may include weeding and/or respacing young trees with sickle, brushcutter or chemical, trimming shrubby and tree vegetation encroaching on rides, paths and fencelines, hedge cutting, swiping rides, verges and open areas, forage harvesting conservation rides, verges and open areas, cutting and removing vegetation from heritage sites, mowing recreation trails, strimming round marker posts, signs, gateway, benches and bins, maintaining visibility splays at access points, cutting and removing vegetation from firebreaks. |
| FCCN004346-117 |
Mineral Consultancy |
07/04/2026 12:00 |
15/06/2026 |
14/06/2030 |
|
£350,000.00 |
|
|
|
|
Forestry England have explored and managed mineral operations on the nations forest since it was established and wish to continue to develop commercial mineral opportunities across the estate. This must be undertaken in reasonable balance with wider objectives including the production of timber and the interests of conservation and the environment. In promoting the multiple benefits of forestry, we also seek to take careful account of the needs and wishes of stakeholders, including local communities.
This framework covers the whole of England. We currently have more than 40 sites in England, made up of a combination of operational sites worked by Tenants, sites worked under leasehold reservation by Landlords, sites used for landfill and 23 in house quarries.
As an increasingly specialised industry, we recognise the need to procure competent professional counsel to aid us in the successful management of these sites. |
| FCCN002397-0-62 |
DPS - National Play Equipment |
23/03/2029 12:00 |
26/07/2024 |
23/02/2029 |
27/10/2027 |
£2,000,000.00 |
|
|
|
|
Dynamic Purchasing System for Play Equipment Design, Supply, Installation and Maintenance across the whole of England. |